ERP Integration Consultant: What They Actually Do and How to Evaluate One
A buyer's guide to what an ERP integration consultant actually does and how to tell a good one from a bad one before you sign anything.
01The Importance of a Specialized ERP Integration Consultant
The integration of an Enterprise Resource Planning (ERP) system is a complex undertaking that demands specialized expertise. A specialized ERP integration consultant brings a wealth of experience and a deep understanding of the intricacies involved in connecting ERP systems with existing applications and technologies. This expertise is essential because ERP solutions are increasingly moving towards hyper-integration, requiring close connectivity with various platforms and advanced technologies such as AI and IoT.
Relying on ERP vendors or generalist developers for integration can expose organizations to significant risks. ERP vendors typically focus on their own products and may lack the broad integration experience necessary for diverse IT ecosystems. Generalist developers, while skilled in a broad range of technologies, might not have seen enough production integrations to know how ERP systems actually behave when something goes wrong. This gap in expertise can lead to integration issues that compromise system effectiveness, introduce data inconsistencies, and increase project timelines.
As covered above, poor integration decisions can have economic consequences, such as projects going over budget and necessitating manual data entry due to failed synchronizations. For example, if the integration is not handled properly, organizations may face costly rework and operational inefficiencies. Additionally, the failure to establish clear data ownership can lead to data integrity issues, causing further disruptions in business operations.
The risks of using non-specialized personnel are stark. An integration project that exceeds its budget is not uncommon when generalists or ERP vendors are tasked with roles beyond their expertise. Furthermore, data re-entry due to failed syncs between systems can result in significant labor costs and potential errors, undermining the overall efficiency of the ERP system.
02Economic Consequences of Poor Integration Decisions
Selecting the wrong integration partner for an ERP system can lead to significant economic risks and challenges. One of the most pressing issues is budget overruns. When integration is poorly executed, organizations may find themselves facing unexpected costs due to the need for additional resources, extended timelines, and potential rework. For instance, if a generalist developer misjudges the complexity of integrating two systems, the project could extend beyond the original timeline, leading to additional labor costs and delays in achieving operational goals. This not only strains the budget but can also impact overall business productivity.
Furthermore, the implications of manual data entry due to integration failures can be profound. If a system fails to sync data correctly, employees may resort to entering data manually, which is not only time-consuming but also prone to errors. These errors can lead to inaccurate data being reflected in the ERP system, ultimately affecting decision-making processes and operational efficiencies. This scenario often results in operational inefficiencies, as teams spend valuable time correcting data discrepancies instead of focusing on their core tasks.
Moreover, poor integration choices can lead to increased project timelines. Each delay compounds the risk of missing critical deadlines, which can have a domino effect on the organizationâs strategic initiatives. For example, if a company is planning to launch a new product but is held back by integration issues, the missed opportunity can result in lost revenue and market share.
Altogether, the economic consequences of poor integration decisions extend beyond immediate financial losses to include long-term operational inefficiencies and strategic setbacks. Organizations that carefully evaluate their integration partners avoid these pitfalls and get a smoother, more cost-effective transition.
03What a Competent ERP Integration Consultant Does
A competent ERP integration consultant plays a crucial role in ensuring ERP systems integrate cleanly with existing business applications. Their responsibilities span a wide range of tasks, each vital to the success of the integration project. Key tasks include discovery and scoping, system-of-record decisions, and data mapping and synchronization architecture.
Discovery and Scoping is the initial phase where the consultant works to understand the clientâs business processes and needs. This involves conducting detailed process mapping, which is essential for identifying which systems need integration and how they align with business objectives. The consultant evaluates existing systems, gathers requirements, and sets realistic project scopes to avoid scope creep that can lead to budget overruns.
System-of-Record Decisions are critical to maintaining data integrity across the organization. The consultant helps determine which systems will serve as the authoritative source for different data categories, ensuring there is clear data ownership. This prevents confusion over data updates and maintains consistency across integrated systems. Failure to correctly establish these systems can lead to data conflicts and inefficiencies.
Data Mapping and Synchronization Architecture involves defining how data fields from one system translate to another and establishing the business logic that governs these transformations. The consultant designs synchronization mechanisms that keep data flowing accurately between systems, whether that means real-time updates, scheduled batches, or event-driven triggers depending on what the specific systems require. This includes selecting appropriate technologies and methodologies that support the ongoing operational process of integration, crucial for maintaining system reliability and performance.
Throughout the engagement, the consultant also provides an overview of the entire process, ensuring transparency and alignment with client expectations. Their expertise in integrating modern ERP systems with other platforms is invaluable, especially as ERP solutions evolve towards hyper-integration, connecting with various applications and technologies.
04Discovery and Scoping Phase
The discovery and scoping phase is a critical initial step in any ERP integration project. During this phase, the primary objective is to closely assess the organization's current systems and identify which systems require integration. This involves a detailed analysis of existing IT infrastructure, business processes, and data flows. The goal is to create a clear picture of how the ERP system will interact with other applications and what data needs to be exchanged.
One of the first tasks is mapping out all the systems that are currently in use and determining their roles within the organization. This includes understanding each system's function, the data it handles, and its interactions with other systems. This process helps in identifying potential integration points and dependencies. It's essential to involve stakeholders from various departments early on to ensure all business needs are considered, which helps in avoiding any oversight that could lead to integration issues later.
A key component of the discovery process is evaluating the business needs against vendor recommendations. While vendors may offer various integration solutions, it's crucial to align these with the actual business requirements. Often, vendors might push for certain technologies or integrations that are not necessarily aligned with the organization's needs. Therefore, the discovery phase should focus on what is truly beneficial for the business rather than what is simply available or promoted by vendors.
Mapping data flows is another critical task in this phase. Understanding how data moves between systems and identifying any potential bottlenecks or points of failure is vital. This involves documenting where data originates, how it is processed, and where it needs to go. Successful projects begin with detailed process mapping, which sets a strong foundation for the subsequent phases of integration. It ensures that data integrity is maintained and that business processes are not disrupted.
Inadequate requirements gathering during the discovery and scoping phase creates risk that compounds fast. Without a thorough understanding of the systems and business needs, the integration project is likely to face significant challenges, such as misalignment with business goals or unforeseen technical obstacles. This can lead to increased costs and extended timelines as the project team scrambles to address issues that could have been anticipated with proper planning.
05System-of-Record Decisions
Determining the system-of-record (SOR) is a critical step in ERP integration projects, as it establishes which system holds the authoritative data for specific categories. This decision is foundational to ensuring data consistency and accuracy across integrated systems. The criteria for selecting an SOR should include evaluating the reliability, accessibility, and security of the data within each system. The system that best meets these criteria for a particular data category should be designated as the SOR.
A key aspect of making these decisions involves a thorough assessment of data ownership. For instance, financial data might be best managed within a dedicated accounting system due to its specialized functionality and compliance requirements, while customer relationship data could reside in a CRM system built for detailed customer interaction tracking. Each data category should be evaluated based on where it is most effectively managed and maintained.
Clear data ownership is crucial because it prevents confusion over data updates and ensures that integrated systems can stay aligned, whether they sync in real time or on a scheduled cycle. Without clear ownership, there can be discrepancies in data, leading to inconsistent information across systems, which can compromise decision-making processes and operational efficiency.
Poor system-of-record decisions can have significant implications. For example, if a company mistakenly sets an outdated system as the SOR for inventory data, it might lead to inaccurate stock levels being reported across sales and logistics platforms. This misalignment can result in either stockouts or overstocking, both of which have direct economic impacts. Moreover, failing to determine data ownership can lead to integration issues, as systems may inadvertently overwrite each other's data, causing data integrity problems.
06Data Mapping and Synchronization Architecture
Data mapping and synchronization are crucial components of ERP integration, ensuring that data flows accurately between different systems. Properly executed, these processes lead to improved data integrity and operational efficiency. Conversely, poorly managed data mapping can result in significant issues, such as data integrity problems and synchronization failures.
Data mapping involves translating fields from one system to another, ensuring that the correct data is transferred and interpreted as intended. This process typically includes defining how data from different applications aligns. For instance, a customer record in one system may have fields like 'First Name' and 'Last Name,' while another system might categorize this as 'Customer Name.' Understanding these nuances is critical for maintaining data accuracy.
Business logic plays a vital role in data mapping, as it defines the rules governing how data should be interpreted and transformed during the synchronization process. For example, if a sales order is marked as 'Pending' in one system, the corresponding field in another system must reflect the same status according to predefined business rules. This ensures that all systems present a consistent view of data.
Synchronization architecture encompasses the technical framework and mechanisms used to keep data consistent across systems. Common sync mechanisms include batch processing, real-time APIs, and event-driven integrations. The choice of mechanism depends on the specific requirements of the integration project, such as the volume of data, the need for real-time updates, and the systems involved.
When selecting synchronization methods, consider factors such as data volume, frequency of updates, and the potential for data conflicts. For example, real-time synchronization might be necessary for systems that require immediate updates, while batch processing could suffice for systems that can tolerate delays. Additionally, the selection criteria should include the complexity of the integration, the technical capabilities of the systems involved, and the level of data consistency required. For instance, if one system can only handle updates every hour, a real-time sync would not be feasible.
Itâs essential to be aware of the risks associated with data mapping and synchronization. Data integrity issues may arise if mappings are incorrectly defined or if there is a lack of consistent business logic. Similarly, synchronization failures can lead to discrepancies between systems, causing operational challenges and potentially impacting decision-making.
For a detailed look at how these same system-of-record and sync-architecture decisions play out in one specific integration pattern, see NewMotion's breakdown of CPQ-to-ERP integration architecture.
07Error Handling and Failure Modes
Effective error handling is critical in any ERP integration project, as failures in data synchronization can lead to significant operational issues. Understanding common failure modes and deciding deliberately how to handle each one is what actually mitigates risks such as duplicate records and data loss.
One of the primary strategies for managing synchronization failures is the implementation of retry logic. This involves automatically attempting to re-establish a connection or resubmit data transfers when a failure is detected. For example, if a data sync fails due to a temporary network issue, a well-designed integration system can automatically retry the sync after a predetermined interval. This minimizes the chances of data loss and ensures continuity in operations.
Another critical aspect of error handling involves logging and monitoring. By capturing detailed logs of synchronization attempts and failures, organizations can gain insights into the root causes of issues. This information is invaluable for diagnosing recurring problems and improving the integration process over time. For instance, if logs consistently show failures related to a specific data field, it may indicate a need for better data validation rules or adjustments in the mapping logic.
Furthermore, organizations should establish clear protocols for error notifications. When a synchronization failure occurs, relevant stakeholders should be alerted promptly so that they can take corrective actions. This could include notifying IT staff or integration consultants who can address the issue before it escalates into a larger problem.
Common failure modes in integrations include situations where data does not sync properly due to format mismatches or inconsistencies between systems. For instance, if one system expects a date format of MM/DD/YYYY while another uses DD/MM/YYYY, this discrepancy can lead to synchronization errors. Additionally, when systems are not aligned regarding data ownership, it can create confusion about which system should be updated, further complicating the integration.
Deliberate error handling, including retry logic, logging, and clear notification protocols, is what keeps synchronization failures from becoming bigger problems in ERP integrations. Addressing common failure modes proactively protects data integrity and keeps operational processes running smoothly.
08Testing the Integration
Testing the integration is a critical phase in the ERP integration process, ensuring that all components function harmoniously before the system goes live. This phase involves a series of structured processes and methodologies designed to identify and resolve issues that could lead to operational disruptions or data inconsistencies.
The testing process can be divided into several phases, each serving a unique purpose. Unit Testing focuses on individual components or modules, verifying that each one performs as expected in isolation. This is followed by Integration Testing, where the interaction between modules is examined to ensure reliable data flow and operational logic. System Testing then evaluates the entire system's functionality, assessing if the integrated system meets all specified requirements. Finally, User Acceptance Testing (UAT) involves end-users verifying that the system supports their day-to-day operations effectively, providing a real-world validation of the system's readiness.
A crucial aspect of these testing phases is the validation against real data. Testing with real data ensures that the system can handle actual business scenarios, detecting any potential issues with data handling and processing. This step is vital because integrating poor quality data can compromise the effectiveness of the ERP system, leading to inefficiencies and errors in business operations.
Moreover, testing should simulate various operational conditions to uncover potential bugs and integration failures that might arise post-launch. For instance, testing under peak load conditions can reveal performance bottlenecks that need addressing, while testing error handling mechanisms ensures that the system can gracefully manage unexpected situations without data loss or system crashes.
Thorough testing of the integration is not just about confirming that the system works, but ensuring it works under all expected conditions. This is what actually identifies and resolves issues early, minimizing the risk of uncovered bugs and integration failures after the system goes live.
09Cutover Strategy
The cutover strategy is a critical component of any ERP integration project, as it determines how the new system will be brought online while ensuring business continuity. A well-planned cutover process can minimize downtime and prevent disruptions, which is essential for maintaining operational efficiency and avoiding potential revenue loss.
Cutover planning begins with a detailed review of the current system landscape and the new ERP system's requirements. This involves coordinating with stakeholders to develop a timeline that aligns with business cycles, ensuring that the transition doesn't interfere with critical operations. For instance, conducting a cutover during a period of lower business activity can mitigate risks associated with downtime.
A successful go-live involves several key steps. First, establish a detailed cutover plan that includes step-by-step procedures for data migration, system configuration, and user training. Each step should be clearly documented and assigned to specific team members to ensure accountability and clarity.
Next, conduct a series of mock cutovers or rehearsals. These practice runs help identify potential issues and allow the team to refine processes and timing. They also provide an opportunity to test the readiness of both the technical and operational teams, ensuring that everyone is prepared for the actual transition.
Communication is crucial throughout the cutover process. Regular updates should be provided to all stakeholders, including employees, customers, and suppliers, to keep them informed of the transition timeline and any expected impacts. Clear communication helps manage expectations and reduces anxiety among users.
Another vital aspect is ensuring thorough data validation and system testing prior to the cutover. This step verifies that all data has been accurately transferred and that the new system operates as expected. Without this validation, there is a risk of data integrity issues that could lead to significant operational challenges post-launch.
Finally, establish a support plan for the immediate post-go-live period. This includes having technical support teams on standby to address any issues that arise and providing additional training sessions to help users adapt to the new system. This support is crucial for a smooth transition and to maintain user confidence.
A poorly executed transition carries real cost. Downtime during the cutover can lead to operational disruptions and financial loss, while data not flowing correctly post-launch can result in inaccurate reporting and decision-making. Thoroughly planning and executing the cutover strategy is how organizations avoid both.
10Post-Launch Operational Ownership and Monitoring
Once an ERP integration goes live, the journey does not end; rather, it transitions into a critical phase of operational ownership and monitoring. The success of this phase hinges on clear delineation of responsibilities and real monitoring discipline to ensure the integration continues to deliver value and remains aligned with business objectives.
Operational ownership post-launch
Operational ownership involves assigning a dedicated team or individual responsible for the ongoing maintenance and management of the integration. This role typically includes monitoring performance, addressing any issues that arise, and implementing necessary updates or improvements. It is crucial that this team has a deep understanding of both the technical aspects of the integration and the business processes it supports. This ensures that any adjustments made post-launch are both technically sound and strategically beneficial.
Failing to assign clear ownership can lead to unresolved issues, as no single entity is accountable for addressing problems when they occur. This can result in prolonged downtime or performance degradation, which could have been avoided with proper oversight. Therefore, establishing operational ownership is not just about assigning responsibility but ensuring that the responsible parties are equipped with the necessary resources and authority to act effectively.
Monitoring strategies
Monitoring strategies should be designed to catch issues early and minimize their impact. This involves setting up automated alerts and dashboards to continuously track the integration's performance metrics, such as data throughput, error rates, and system availability. These tools should be configured to notify the operational team immediately if anomalies are detected, allowing for rapid response and mitigation.
In addition to automated monitoring, regular manual reviews and audits of the integration are essential. These reviews help identify trends or recurring issues that automated systems might miss and provide opportunities for proactive improvements. By regularly analyzing the integration's performance data, the operational team can make informed decisions about necessary enhancements or optimizations.
A well-structured monitoring strategy also includes a feedback loop with end-users to capture their experiences and any issues they encounter. This user feedback is invaluable for identifying problems that might not be visible from a technical perspective alone and ensuring that the integration continues to meet user needs effectively.
Post-launch operational ownership and monitoring work when responsibilities are clearly defined and monitoring is real, not aspirational. A dedicated owner and a real monitoring system are what let organizations manage their ERP integrations effectively, minimizing disruptions and protecting the value the integration was supposed to deliver.
11Evaluating an ERP Integration Consultant
Selecting the right ERP integration consultant is vital for ensuring a successful integration process. A well-chosen consultant not only possesses the necessary technical expertise but also understands the specific needs of your organization. To effectively evaluate potential consultants, organizations should focus on key qualifications and relevant experience.
When evaluating consultants, consider the following key qualifications.
Technical expertise. Look for consultants who demonstrate a deep understanding of ERP systems and integration processes. This includes familiarity with various data mapping techniques, synchronization architecture, and error handling strategies. A consultant should also have experience with the specific ERP software you are implementing, whether it be SAP, Oracle, or another platform.
Certifications. Consultants with recognized certifications, such as the Microsoft Solutions Partner designation, can provide assurance of their capabilities. These certifications often indicate a commitment to maintaining knowledge of best practices and current technologies in the ERP landscape.
Industry-specific experience. It is crucial to find a consultant with experience in your specific industry. This experience allows them to offer solutions that fit industry standards and practices. For instance, a consultant with a background in healthcare will understand the unique compliance and data management challenges that come with integrating ERP systems in that sector.
In addition to qualifications, consider the consultant's approach to project management. A structured methodology ensures that the project stays within scope and timeline, which is essential for avoiding budget overruns. Ask potential consultants about their previous projects and how they handled challenges during implementations. This can reveal their problem-solving capabilities and adaptability.
Furthermore, evaluate their communication style and responsiveness. A good cultural fit between your organization and the consultant can lead to a more collaborative working relationship. Effective communication is vital for addressing issues as they arise and ensuring that everyone is aligned on project goals.
Lastly, inquire about post-go-live support. Successful ERP integrations do not end once the system is launched; ongoing support and maintenance are critical for long-term success. Ensure that the consultant provides clear and itemized pricing for their services, including any post-launch support they offer.
12Questions to Ask During Consultant Evaluation
When evaluating potential ERP integration consultants, asking the right questions can meaningfully improve your chances of selecting a qualified expert who aligns with your organizationâs needs. Here are some specific questions to consider during the evaluation process:
What is your experience with ERP integrations similar to ours? This question helps gauge the consultant's familiarity with your industry and specific ERP systems. Look for responses that include past projects, specific challenges faced, and how those were overcome.
Can you provide case studies or references from previous clients? Requesting case studies or references allows you to assess the consultant's track record and the satisfaction level of past clients. Pay attention to any quantifiable results they can share.
What methodologies do you use for project management? Understanding the consultant's approach to project management can reveal their organizational skills and ability to keep projects on track. Look for mentions of structured methodologies that promote clear timelines and scope management.
How do you handle data mapping and system-of-record decisions? This question focuses on their technical expertise in critical integration areas. A competent consultant should articulate a clear process for ensuring data integrity and defining authoritative sources of data.
What is your approach to error handling and post-launch support? It's essential to understand how the consultant plans to address potential issues post-launch. Look for a commitment to ongoing support and a proactive approach to monitoring and resolving problems.
What are your pricing structures and how do you handle project scope changes? Transparency in pricing is crucial. Ensure the consultant provides clear, itemized pricing details and is willing to discuss how they manage additional costs that may arise from scope changes.
When assessing responses to these questions, consider the following:
Depth of Knowledge. Are the answers detailed and specific, indicating a thorough understanding of ERP integrations?
Relevance of Experience. Do their past experiences align with the specific needs of your organization?
Communication Skills. Is the consultant able to explain complex concepts in a way that is easy to understand?
Problem-Solving Ability. Do they provide examples of how they have tackled challenges in previous projects?
By asking these questions and evaluating the responses carefully, you can better assess the suitability of a potential ERP integration consultant for your organization's unique integration needs.
13Red Flags to Watch For
When evaluating potential ERP integration consultants, it's crucial to be vigilant about certain red flags that may indicate a lack of expertise or suitability for your project. Recognizing these warning signs can help you avoid costly mistakes and ensure a smoother integration process.
One common red flag is a consultant's inability to demonstrate relevant experience. If a consultant cannot provide specific examples of past ERP integrations, particularly within your industry, this may suggest they lack the necessary expertise. For instance, a consultant who has primarily worked with small businesses may not possess the knowledge required for a large-scale enterprise integration, leading to potential project pitfalls.
Another significant indicator of a consultant's inadequacy is their vague or generic responses during the evaluation process. If they provide answers that lack depth or fail to address specific technical challenges related to your integration needs, it may signal a lack of understanding of the complexities involved. Effective consultants should be able to articulate a clear strategy tailored to your unique business context.
Additionally, be wary of consultants who promise unrealistic timelines or budget estimates. Integration projects often encounter unexpected challenges, and any consultant who guarantees swift results without a thorough assessment may be overselling their capabilities. This can lead to budget overruns and project delays, undermining your overall objectives.
Lastly, a lack of emphasis on ongoing support and post-launch monitoring can be a concerning sign. A competent consultant should prioritize long-term success by outlining their plans for post-implementation support, ensuring that your integration remains functional and aligned with evolving business needs.
Being aware of these red flags, inadequate experience, vague responses, unrealistic promises, and insufficient support, helps organizations make more informed decisions when selecting an ERP integration consultant.
14When You Might Not Need a Dedicated Integration Consultant
While hiring a specialized ERP integration consultant is often essential for complex integrations, there are scenarios where a dedicated consultant may not be necessary. Understanding these situations can help organizations allocate resources more effectively and avoid unnecessary expenses.
One condition under which a generalist may suffice is when the integration project is relatively simple. For example, if a company is integrating a basic payroll system with an existing accounting software, the integration typically involves straightforward data transfers without the need for complex mappings or transformations. In such cases, a generalist developer familiar with the systems may handle the integration efficiently.
Another scenario is when the organization has a well-defined and limited scope for integration, such as integrating only two systems with minimal data exchange requirements. If the integration involves standard data formats and established APIs, a generalist may effectively implement the integration without the specialized knowledge that a dedicated consultant would provide.
However, choosing not to hire a specialist can have implications. Organizations may face risks such as inadequate understanding of system interactions, which can lead to data integrity issues or synchronization failures. A generalist may lack the experience to foresee potential pitfalls, which could result in operational disruptions down the line.
Ultimately, the decision to forgo a dedicated consultant should be based on a careful assessment of the integration's complexity, the organization's internal capabilities, and the potential risks involved. Organizations should weigh the simplicity of the integration against the value that specialized expertise can bring.
For instance, a simple integration scenario could involve syncing customer information between a CRM and a basic email marketing tool. If the data fields align well and the integration requires only periodic updates, a skilled generalist might handle this efficiently without needing extensive consultation.
15NewMotion's Engagement Model and Fit
NewMotion's own stated approach on its systems integration page is that the commercial offer is the connected operational system, not a particular tool. That framing matters here: it means the delivery mechanism, a middleware platform, a direct API connection, or a custom build, gets chosen based on what the specific systems involved actually support, not a default preference for one approach.
In practice, NewMotion works across ERP integration, warehouse and 3PL connections, CRM-to-ERP linkages, and custom middleware, treating each as a variation on the same underlying problem: systems that should already be talking to each other directly but currently are not.
The clearest fit is a business currently doing manual re-entry between systems that should already be synchronized, an operations or finance team re-keying orders, inventory counts, or customer records between an ERP and whatever else runs the business, because nobody has built the connection yet, or the one that exists has quietly stopped working.
This applies whether the ERP itself is on-premise or cloud-based. As more companies move to cloud ERP, the systems around it (CRM, ecommerce, warehouse, banking) still need a real connection strategy; moving the ERP to the cloud does not, by itself, make the integration problem go away.
16Practical Next Steps
As you navigate the process of selecting an ERP integration consultant, it is crucial to summarize the key insights and outline actionable steps. First, revisit the evaluation criteria discussed earlier: prioritize consultants who possess relevant industry experience, recognized certifications, and a structured methodology. This ensures that the consultant can address your specific needs and maintain project scope and timelines effectively. For instance, consultants with industry-specific experience can offer solutions that actually fit your business requirements. Additionally, inquire about their post-go-live support and clear pricing structures to avoid unexpected costs.
Next, engage in a thorough evaluation process. Prepare a list of essential questions to ask potential consultants, focusing on their experience in similar projects, their approach to integration challenges, and how they plan to manage communication throughout the project. Assess their responses critically to gauge their expertise and fit for your organization. Look for consultants who communicate clearly and demonstrate responsiveness, as this is indicative of a good cultural fit.
Finally, if you want a second, specialist opinion on your own ERP integration scope, talk to NewMotion about a systems integration engagement. NewMotion's approach starts with the same discovery work described above: understanding which systems actually need to connect, then choosing the sync mechanism, a native connector, a middleware platform, or a custom build, based on what those specific systems support. The useful next step is a conversation about your actual systems, not a generic pitch.
Sources
- 11 ERP trends for 2023 and beyond | Future of ERP | SAP
- ERP needs relevant functionality in 2023 | TechTarget
- Top 10 Trends for ERP in 2023 | Velosio
- From Full-fledged ERP Systems Towards Process-centric Business Process Platforms
- AI Integration In ERP Evaluation Across Trends and Architectures
- Erp Consulting Industry Statistics 2026 | Gitnux
- How to Evaluate an ERP Implementation Partner (2026 Guide)
- 9 Key ERP Consultant Selection Criteria to Help You Choose the Right Partner â SOPHISTICATED CLOUD⢠- Squarespace Web Designers
- Independent ERP Consultants: Rates & Hiring | ERP Research
- ERP TCO 2026: 5-Year Total Cost Comparison â SAP, Odoo, Dynamics, Sage
- ERP Integration Costs: What You Should Expect to Pay | Uptimize Solutions
- ERP Integration: How to Avoid Common Mistakes | IronLink Digital
- ERP System Integration Risks: Data Disaster Prevention Guide
- ERP Integration Best Practices: Strategy, Methods & Success Tips - Clear Spider
- ERP Integration for Ecommerce â Guide & Architecture | NWT
- ERP Integration Best Practices and Strategies
- Common Challenges in ERP Integration
- Why ERP Integrations Break and How to Prevent It